Skip to Content
0
Former Member
Dec 01, 2008 at 08:52 AM

In Demand planning design evaluvation

16 Views

Hi All,

We are going to do roll-outs for our project, at this juncture I have some doubts on roll-outs, It will be appreciated if any one can through some light on below mentioned doubts.

- How can I evaluate my design ( i.e Number of characteristics, number of key figures and time buckets used) is optimal and makes best use of live cache space.

-- What and how, points to be checked if I wants to add some more planning areas and Master planning objects on the same existing live cache space (In terms of available size before and after adding new objects).

Thanks in advance.

-- Aravind