Dear SAP Experts,
The situation is as following:
Material X is already transferred from Plant A to Plant B with quantity 2 EA.
But somehow those materials are not required anymore in Plant B, therefore they should be returned back to Plant A.
However instead of transfering those materials from Plant B back to Plant A, materials are transferred from Plant C to Plant A. Therefore there is a deficit stock in Plant C because of this mistake.
Is there any possible way to fix incorrect above material movement posting other than cancelling the posting one by one?
Please advise.
Thank you
Regards.