Dear Guru's,
I have three prodution versions for material with three different alternative BOM and same recipe for all three versions. All three versions are with same lot size and date validity. when i do cost running which version will be considerd by system as default? is frist version? if it is frist version what seeting is required to pick req version to consider for costing?
sree