Hello experts,
My question is the following:
In our production system we are using infosource 2LIS_11_VAITM to load an ODS by delta load. Now we have connected the same infosource to a new ODS.
When it comes to init load the new ODS for the first time, I know I need to do a set up table in R3 and then load into BW,
but will it affect the delta process of the old ODS or do I have to do an init for both ODS's?
Can I do a full delta for the new ODS and then init without data transfer + deltas?
We simply want to avoid doing a re-init of the old ODS in the production system. Is it possible?
Thanks in advance
Inma