Dear experts,
I want to change the base unit of measure of a material. System is giving me a message
1. Stocks already exist at plant level.
I have gone through the procedure for removing stock from the previous period i.e. from Oct 2008. What procedure is to be followed for removing the stock from the period before oct i.e. if the stock is existing in Septmber or August.
2. Also there is one more message "Production orders already exist that are assigned to the
material". I have checked that order, the order is closed.
Pl. suggest how to go about.
Regards,
Prashant