Hai girus,
I have one doubt , pls correct if i am wrong.
1) For inspection type 01(incoming inspection) and 04(inspection after GR) we will be using inspection
plan with usage as 5 and status as 4 and control key as QM01 to specify the inspection characteristics.
2) For inspection type 03( inprocess inspection) we will not use inspection plan but we will be using
routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
waiting for positive feed back.
with regards,
sekar chand