Dear

At the time of releasing the production order i got error

Error during availability check for order 6000137 (see log)

Message no. CO820

Diagnosis

Errors occurred during the availability check for order 6000137. For information on the exact errors, see the log.

Usually, these error messages are written to the log for the availability check. However, if the availability check is performed, for example, during an order release process, the messages appear in the release log. Similar variances can occur if you call the availability check from other contexts.

System Response

The check was canceled. The results in the order reservations and in the order header are not necessarily correct!

Procedure

Use the error messages in the log to locate and solve the cause of the errors. Afterwards restart the availability check.

Thansk& Regards

Sandeep

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 27, 2008 at 02:58 PM

    Dear Sandeep

    in material master have u maintained 02 in availability check of the MRP view?

    sree

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 22, 2014 at 06:30 AM

    Dear Sandeep

    1. Check availability check for material and BOM related material..

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 27, 2008 at 04:18 PM

    can you paste the message in the error log. that will help in resolving the issue soon.

    Regards,

    Pravin

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 28, 2008 at 03:38 AM

    Mr. Sandeep,

    I think u haven't maintain the Individual check (02) at Availability check in Material Master.

    Maintain the same, u will get rid from the problem.

    Parminder

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 28, 2008 at 03:51 AM

    Dear,

    Check the exect error in CO02GotoLog.

    Check in transaction OPJK

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 20, 2019 at 11:13 AM

    Hello,

    First go to OPJK select your order type, then check material checking rule select 2 ( check availability During order release,

    Also check Material availability

    Checking rule (PP) and Collective conversion

    Then go to Checking rule OPJJ

    Check For Availability 01 Checking rule PP

    Also select Availability 01 in MRP in Master Data

    then check it while order creation

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.