Skip to Content
author's profile photo Former Member
Former Member

Using BAdI to change field

Hi everyone,

I have the following problem: We want to assign the value of field BKTXT to the field XBLNR when creating a material document. We have now found a badi that gets called when creating the document.

The badi has an importing parameter xkpf.

I can read that parameter and do anything I want with the values. However, the question is: How do I get a value back from the badi processing to the normal programms processing?

Anybode got a hint for me?

Regards,

Martin

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 27, 2008 at 12:16 PM

    Hi,

    Use set and get Parameters.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.