Hi All,
We are using the SAP standard scheduler SDV03V02 for SD order re-scheduling.
Unfortunately at some orders this program is "spamming" the change log of the schedule lines even if there's nothing to be changed.
The scheduler is running 2 times a day it's changing nothing but adding an extra scheduling line and then immediately deleting it.
If you suspect why is this happening feel free to enlighten me.
Especially if you know how to eliminate this.
Thank you
Tamas
The issue is still re-occurring sometimes. We spent numerous hours with the analysis, with very limited success on changing this SAP standard behavior. These are some of the contributing factors for that (I can't recall all of them now):
- ATP settings - checking rule, etc
- More frequent at Make To Orders
- Sales Order item type - it mainly/more frequently happens at non-stock materials - grouped together with stock materials
- old, but non-closed Purchase and production orders can also be a "risk factor"
I have no exact resolution until now... Let me know if you have something else...
Thanks
Tamas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello tamasnyisztor at the end. What was the reason?... of this ..
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Have a look at OSS note 1861066
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.