"COST" Table update

Can anybody tell, how can we update Std. table COST?

Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Nov 27, 2008 at 10:04 AM

    Dear Deven,

    Check this,

    Product Cost = Materials Cost(ROH + HALB Materials Cost)Activity Cost (Operation Cost)Overhead

    Cost.

    1.Raw materials cost are generally entered as Planned price along with the valid from date in Costing 2

    view,and price control indicator is "V".Origin group has to be given to all the Raw materials in costing 1

    view.

    2.For HALB Materials Price control indcator will be S for Inhouse manufactured & V for externally

    processed materials (Sub-Contracted Items) respectively.Also assign Overhead group for all Inhouse

    manufactured items.

    3.No need to enter any value for the materials having S as the price indicator and for Sub-contracted

    items that's F30 also no need to enter any cost in the material master.

    4.Activity cost is the cost incurred in performing individual operation.This cost is captured via the work

    center which we mention in each operation in the routing of that product.A Cost centre and an

    appropriate activity type is assigned in the work centre.

    5.Proper Cost should be assigned for the combination of Activity type and Cost centre.

    6.Overhead cost is the indirect cost that we capture according to the customer's requirement.

    7.If certain items for certain products alone should not be considered for costing means,then we can

    achieve this using costing relevancy indicator in the BOM and for the activity(operation's mentioned in

    routing) which should not be considered for costing also can be mapped by removing the costing

    relevancy indicator in routing.

    Overhead group is aasigned in Costing1 view.

    8.Creating Cost center - KS01

    9.Create Activity Type - KL01.

    10.Assiging Rates for a cost center/activity type combination in T code KP26.

    11.Cost estimate Related T codes are CK40N,CK11N,CK24.

    12.UseCK40N always,so that you can do the costing ,mark the price and release the same.Generally

    Cost Rollup will be taken for Finished product so that the sytem automatically calculates for the Semi-

    Finsihed products standard cost.

    13.IF you use CK11N,then only costing will be done,but for marking and release you have to use CK24.

    14. Table COST get's updated say For Eg: After Actual Cost calculation using T Code KSII

    Regards

    Mangalraj.S

    Edited by: Mangalraj.S on Nov 27, 2008 3:38 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 20, 2009 at 10:48 AM

    Hi Deven,

    Use Transaction code KP26 to enter prices for an activity type and cost center combination.

    Regards,

    Hiten Patel

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 18, 2009 at 02:15 PM

    Answered

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.