cancel
Showing results for 
Search instead for 
Did you mean: 

Transferring MIC results to Batch

Former Member
0 Kudos

Hi Gurus,

I want to transfer the MIC results to the Batch,I have maintained the following.

1.All MICs are linked with batch characteristics individually.

2.All the batch chracteristics are assigned in Batch class which is assigned in material master.

3.I have maintained the inspection plan for the material with relevant MICs.

But when i am doing my Result recording/UD the MIC results are not transferred to Batch.

Where i am missing,can anybody help me on this...

Rgds

Gobi

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Shyamal,

i have sent the screen shots to ur hotmail id...pls check and revert back..still i am unable to transfer the characteristics to batch

Rgds

Gobi

Former Member
0 Kudos

Hi Gobi,

Pls refer the [thread |;and find the solution, if can't pls revert.

Regards,

Shyamal

Former Member
0 Kudos

Hi Shyamal,

Thanks for prompt reply.

I follwed the procedures but still i am unable to transfer.

Anything else i am missing?

Rgds

Gobi

Former Member
0 Kudos

Sorry my dear friend.

I have pasted you the wrong thread.

Pls find the correct one [here|;

I hearty regret for the inconveniences.

Regards,

Shyamal

Former Member
0 Kudos

Hi Shyamal,

Thanks for prompt reply.

you have given the correct link.I am getting anchor sign in ref to class chracteristics column.

Still it is not getting transferred.

Wht may be the reason

Rgds

Gobi

Former Member
0 Kudos

Hello Gobi,

AS per the same link check ,,,,,,,,

- SPRO Settings,,,

QM->Maintain Settings at Plant Level->Insp. completion tab->Batch Valuation without material spec should be ON for transferring results through RR screen to Batch.

- Hope you checked all the possibilities. Any way check this... Activate Insp. with Material spec. for Inspection type, Maintain material specification in QS61 and rerun the cycle.

Inspection results are only transferred to the batch record under the following scenarios:

In all cases, the mics must be created with reference to the general characteristics (which you indicate you did)

1) As stated in a previous reply, you can set the config setting in the plant settings. "batch valuation w/o material specification." This should be checked on.

2) You maintain a material specification and in the material master you select "inspect with material spec". (You might have this checked in addition to "inspect with task list".) You can not unlock the characteristic in the inspection plan in this case. The specs come from the batch. If you break the link, the values do not transfer. (unless the above config setting was set).

In both case you maintain the 023 (or 022) batch class for the material.

Keep in mind values are only transferred to the batch when an inspection point is valuated or a UD is made.

Hope this helps.

Craig

Regards,

Shyamal