Hi Guru
My scenario is:
1) create SC with manual imputation of the price
2) by User Exit/Badi assign SC to Contract/Contract Items.
The problem is: when system assign the contract to SC, the manual price on SC is update with price from Contract.
I want not to modify the manual price on SC!!!
It's possible?
Thanks