Hi
I am from pharma company , and for in-process inspection lots starts with 03 inspection type we want to confirm the results though valuation and don't want to assign usage decision.
can i set automatic UD for 03 inspection type ?
is it possible to to give confirmation for further processing through valuaion for characteristics even if it fails?
in-process (03 -inspectin lot) results are confirm through valuation than is it required to do usage decision ?
can anybody reply on this,
Edited by: AYK on Nov 26, 2008 6:05 PM