Hi,
We are installing SAP ECC 6.0 in Windows 2003 with SQL 2005 backend in MS-Cluster.
We have 2 nodes, where we have installed
1. ASCS
2. SCS
3. First MSCS Node
4. Database Instance
5. Second MSCS Node
6. Central Instance in Node 1
Now we are installing Dialogue Instance in Node 2, when we give the SLD Destination
SLD Http host - solution manager system is given
SLD Http port - 50400 (04 is the instance of solman)
SLD Data Supplier User - SLDDSUSER
Password of SLDDSUSER - given
(able to login into the solman system with the SLDDSUSER and the same password)
If i press next, it gives the message:
Check Prerequisite Agent setup failed. Choose "Cancel" to modify managing configuration or "OK" to continue. If you choose to continue the SMD Agent setup will fail during installation.
But, SLD is running in the solution manager system, when i login through portal.
Please clarify.
Regards,
Nagu