We have a material (FER3) with procurement type E and MRP type X0. This material has a BOM with 2 components (procurement type F and special procurement 20 and MRP type PD).
When we run the MRP (MD02), itu2019s generated a Planned order for the FER3 (which shouldnu2019t happend) and nothing for the components (which should have generate solpeu2019s).
The father material shouldnu2019t be fabricated and the components should have solpeu2019s.
Thanks you!