SAP BW Utilities - Sales Statistics extraction process for 0UC_SALES_STATS_02

Former Member
0 Kudos

Hi Experts,

Please see my questions below:

1. For Delta process what is the date range which needs to run on daily basis in ECC side (EBW_DQ_SS)? with posting date (previous day) how we schedule on daily basis (automation)

2. BW side selection in infopackages is set to default with init (w/o data transfer as per process) so Delta is set to same range (eg. I need delta to be captured from 01/01/2018 - 12/31/999); Does the delta mode take care of only the Deltas which will be executed in EBW_DQ_SS automated process?

3. I ran the delta after first load with the job I ran in ECC side (EBW_DQ_SS) and it did all the data extraction just like old extractor so wanted to know if the new sales_stat_02 extractor delta works differently or whats different than old process as in ECC side the process is still the same (run mass activity job and give date range for daily data loads).

If someone can explain the process to put the mass activity on schedule (how to automate) and delta setting in BW side would be re-assuring of what I am doing right now (I am still trying to figure the automation part).

Thanks,

RD

Accepted Solutions (0)