Skip to Content

Equipment PRT convert as Material PRT

Hello Expert,

We are doing performance based maintenance for equipment PRT based on Production order confirmations.

(identical equipment have unique eq. number Eq1 & Eq2 and usage are count by two counters / Two Maintenance Plans)

Now we need to Materialize these equipment and assign as Material PRT to Production Order. I need to clarify below issues:

  • Whats is the standard SAP solution? having single Material code for Identical multiple Equipment?
  • How the production confirmation determined the correct Equipment to count ( Since we assign Material PRT to operation not the equipment)
  • How the availability check PRT take place when Order release

Please help

Thanks in Advance

Ashok M

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers