cancel
Showing results for 
Search instead for 
Did you mean: 

Product Cost Collecter

Former Member
0 Kudos

Friends,

In Repetitive Mfg. suppose I hav 25 production version. So shud I require 25 Product Cost Collecter.

OR any other facility is there?

Please guide

Accepted Solutions (0)

Answers (2)

Answers (2)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Yes, in rem before backflushing to be done for materail , u have to create product cost collecter. since all the production cost are to be collected to PPC. u need not create every time.u only create PPC For a material & prod vesrion combination at one time only.

use KKF6N to create PCC for a material and select pv for the material for creating

When using KK6M the collective creation of product cost collector- pcc will be created for production version of the materials selected and MF30 to create preliminary cost estimate for the materials.

Hope clear to you.

Regards,

R.Brahmankar

Former Member
0 Kudos

Sir,

If I hav done all these things but clear my idea about costing in REM.

i.e. Preliminary costing, Process allocation costing, Surcharges,Variance costing and Settlement

former_member184655
Active Contributor
0 Kudos

Dear Khema,

Preliminary Costing will be done automatically at the time of Product cost collector creation in T code

KKF6N and this cost will not get stamped in the material master.

It's just a sum up of the materialoperationoverhead costs.

Everytime when there's a change in BOM or Routing details you can make it effective by coming to

KKF6N>change mode>click on cost calculation button ---> save.

Process Allocation cost-- do you mean to say the operation cost?It comes out through the cost

center+activitye type combination assigned in T code KP26 which will be linked into the work center

which will be allocated in the routing operations.

Variance & settlement will be carried out periodically using T codes KKS6 & KK87 respectively.

Regards

Mangalraj.S

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Goto KKF6N - Process Product Cost Collector

Carryout the cost rollup & release using CK24 or CK40N ( or cost estimate in CK11N and releasing it using CK24)

Over head calculation - (Co42)

Variance calculation (KKS6)

Settlement(KK87)

Hope it will help ypu.

Regards,

R.Brahmankar

former_member184655
Active Contributor
0 Kudos

Dear Khema,

If there are 25 production versions for different materials then you have to create product cost collector

for each of them using T code KKF6M(collectively) or else KKF6N (for individual material) where

preliminary costing will be carried out while saving the datas in KKF6N.

Regards

Mangalraj.S