HI,
I wnt to map following scenario :-
We are having a bar of length of 5000mm(A)
We want to cut it in two bar 3000mm(B) and 2000mm(C)
Material master for all 3 material were created.
I am creating a PO for 3000mm (B) with item cat L
In component I am mentioning material 5000mm (A)
and 2000mm(C) in negative quantity.
with MB1B material 5000mm bar (A) is supplied to vendor
at the time of GR Stock of 3000mm (B) is update with mvt typ 101 stock of 5000mm (A) is consumed
and stock of 2000mm (C) is showing at vendor for this material mvt typ 545-O is generated automatically.
how can I transfer that stock or is it possible to change that automatic movement 545-O
Thanks
Prakash