Hi,
What is MRP Type? How many MRP types are there?
Thanks & Regards
Saeed Arif
Dear,
MRP type define the way of planning of material like PD which is relevent to MRP and ND which is non relevent to MRP. Like wise VV for forecaste and VM and VB we use for consumption base pllaning.
If you want consumption base planning then you have to set an MRP type for the material in the MRP Type field in the material master (View MRP 1) to Reorder point planning, for example VB or VM. But we want to use MRP procedure then we need to maintain PD.
MRP types : In the MRP types different categories are there
1) Produce to Demand
2) Consumption based planning
3) Forecast based planning
It is procedure that you set in the system on how the Material is planned
- Reorder Point
- Seasonal requirement
- Replenishment
- Forecast Based
- Master production Scheduling
SPRO --> MM --> Consumption based planning --> Master data --> Define MRP types
or you can check in material master MRP1 view by pressing F4.
Hope clear to you.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
MRP Type is nothing but simply the possible ways of carrying out Material Requirement Planning ( MRP) in Standard SAP.
Following are the major categories of MRP Type:
1. MPS - Master Production Scheduling
2. MRP - Material Requirements planning
3. Consumption based planning - (there are two types)
i) Forecast based planning
ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
Hope this helps.
Revert if any doubt or need more details
Regards,
Tejas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
It determines whether and how the material is planned. You have the following options:
Manual reorder point planning
Automatic reorder point planning
Forecast-based planning
Material requirements planning with forecasts for unplanned consumption
Master production scheduling (MPS)
The following MRP types are defined in the SAP standard delivery:
ND => no MRP
PD => MRP
VB => manual reorder point planning
VM => automatic reorder point planning
V1 => Automatic reorder point planning including external requirements
V2 => Automatic reorder point planning without external requirements
VV => forecast-based planning
1. If necessary change the settings in the standard SAP syste.
2. Add new MRP types to suit your requirements.
-ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
MRP type means,
Key that determines whether and how the material is planned. You have the following options:
Manual reorder point planning
Automatic reorder point planning
Forecast-based planning
Material requirements planning with forecasts for unplanned consumption
Master production scheduling (MPS)
Regards,
Imran Shek
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.