Hi All,

I have created LSMW for Inspection plan (QP01) through Direct Batch Input method.

I want to pass Sampling Procedure control indicator (STICHPR) and sampling procedure (STICHPRVER) through this for which i have included respective fields and done the mapping as shown in screen shot.

But when inspection plans are loaded sampling procedure details are not updated even i have tried through foreground mode and found program is not going in that screen where we tick the sampling procedure checkbox.

Please help in this.

sampling.png

sampling.png (17.8 kB)
10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Arijit Banerjee Nov 04, 2016 at 11:38 AM
0

Hi Nikhil,

I think there is some issue in "Maintain Field Mapping and Conversion Rules" for your Inspection Plan LSMW. Please investigate the structure BIPMK to look for the fields - STICHPR and STICHPRVER and the rules associated to these two fields.

For example, if file structure upload field STICHPR is 'Initial', then BIPMK-STICHPR = '/'. Else, BIPMK-STICHPR should be picked form upload file structure. Similarly, if BIPMK-STICHPR = '/', then BIPMK-STICHPRVER = '/'. Else BIPMK-STICHPRVER should be picked form upload file structure.

I still feel that you may skip the use of this field STICHPR and just go ahead with the field STICHPRVER (Sampling Procedure) form the upload file only. I think that should be a simpler logic to adopt and test by your program.

Thanks,

Arijit

Share
10 |10000 characters needed characters left characters exceeded
Martin Hinderer Nov 04, 2016 at 03:01 PM
0

Which batch/direct input object and method are you using?

You might instead consider using the Business Object Method (BAPI). Business object BUS1191 (Inspection Plan).

Regards