Hi,

I have a peculiar requirement where i am producing a particular sfg (all materials are MTS 40) and keeping it in stock. I am producing this sfg against PIR's. This sfg is used as a component in the BOM of some FG. Now when i get the sales order for the FG, I am running the MRP at plant level for all the materials then, another planned order is getting generated against the PIR of the sfg. The solution for this problem was to run the MD03 (single level MRP) for the FG item but this solution is not acceptable to my client as they run MRP at plant level. How do i prevent the planned order to get generated for the SFG the 2nd time when i run the MRP at FG level?

STEP 1: run md02 for sfg against PIR

2: Keep sfg in stock after producing in production order

3 Sales order for FG

4: run MD01 for all materials

5: problem is that another planned order is getting generated for the sfg which is not required.

How do i overcome this problem?

Thanks,

Ariel.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Maintain the following settings.

For FG and SFG - Lot size EX, Strategy group 40, availability check 2 and In mrp 4 select Individual/collective requirements as 2 ( i.e collective requirements only).

check it and revert back for further clarifications

regards

Venkat.V

Former Member
0 Kudos

Hi Venkat,

I have tried your suggestion but system is still generating planned orders for the SFG when i run the MRP at header (FG) level.

Do you have any other solution i could use?

Thanks,

Ariel.