cancel
Showing results for 
Search instead for 
Did you mean: 

Material Master

Former Member
0 Kudos

Dear All,

I have a material master present in my plant XXXX and YYYY.

The base unit of measure is TO.

But for one plant i want to keep order unit for purchasing as TO and for the other plant as KG.

I am finding it not possible.Do anyone can help me in giving some idea on how to acheive this?

Regards,

Indranil

Accepted Solutions (0)

Answers (8)

Answers (8)

Former Member
0 Kudos

closed

Former Member
0 Kudos

Hi,

Activate the variable order unit in purchasing view by setting it to 1 for that field.

Thanks,

K R Vishnu Kumar

Former Member
0 Kudos

Thanx to all of you.

I have maintained the UoM as TO and in the additional data we have maintained 60 PC with 1 TO.

Now i am moving to the purchasing view and gave plant as XXXX and maintained order unit as PC and save it.again i selected the purchasing view and gave plant YYYY,here i am seeing that system has also taken the order unit as PC.If i remove it also the it gets removed from the purchasing view of the other plant.Now how to resolve this?

regards,

indranil

kunal_ingale
Active Contributor
0 Kudos

hi plz check my erlier reply

as pur view is at the client level the changes will affect all plants, changing the unit is of no use

u have to maintain different unit in info record and try

regards

kunal

Former Member
0 Kudos

You can change same in inforecord for certain material-vendor- plant Me11

then order unit entered as above in inforecord will be defaulted in PO

Former Member
0 Kudos

Hi,

The only way to maintain diffrent order units at plant level for that material is in info record.i.e ME11-create info record. If you have selected info indicator in purchase order then go to ME12-Change info record and make changes to order unit.

Regards

M P D Kamath

Former Member
0 Kudos

Hi,

You can maintain Order unit as per the Plant level. System will allow you to save the order unit different for different plant.

Purchasing view is maintained at the Plant level not at the client level.

It is possible to maintain order unit different for different plant.

rgds

gsc

Former Member
0 Kudos

Hi,

The fact is that the 'Order unit' field is at client level (Table MARA) and therefore, is cross-plant setting. The workaround solution is, however, to set it through plant-specific purchasing master data such as contract or info record.

Cheers,

HT

Former Member
0 Kudos

In Material master --> purch view there field Order Unit, you can specify an order Unit Uom There (plant level) .

Maintain the convertion also in mat master additional data --> Uom

kunal_ingale
Active Contributor
0 Kudos

hi

it is not possible as the purchase view is at client level

try changing it in info rec

regrds

kunal

Edited by: kunal ingale on Nov 14, 2008 9:13 AM