i am a PP consultant basically, now i am asked to switch over to apo. can somebody help me with basic APO PPDS/DP configuration document. pls send it to sandes75ATgmailDOTcom

sender will be rewarded

thanks

sanjeev

Accepted Solutions (1)

Accepted Solutions (1)

Former Member

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Sanjeev,

Please search the forum and you will see several posts exactly asking for what you are asking.

Former Member
0 Kudos

Typical process flow of an order created in Production Planning and Detailed Scheduling in the APO is mentioned below :-

An planned order is created in PP/DS and this information is transferred to the connected R/3 System.

The planned order is then converted into a production order in the R/3 System and informs the APO System of this change.

A change of requirements or the receipt of new orders in APO cause a change in schedule which affects the production order.

This information is once again passed onto the R/3 System.

Once completion of the order has been confirmed in the R/3 System, the orders are deleted from both APO and the R/3 System

For more information on PPDS you can check this :-

http://help.sap.com/saphelp_scm50/helpdata/en/bd/147a375f0dbc7fe10000009b38f8cf/frameset.htm