Hi all ,

I have a interesting question that might be solved process oriented storage control or layout oriented storage control but i want to get your thoughts.

Firstly, you can look at enclosed screenshot.

To Sum up , steps are given :

HU is created in semi-product production line then transfered to ewm storage location.

HU wait in GR Area then SAP might recommend destination storage bin. But , our scenerio, Hu must be transfer to IN-X location. X must be dynamic corresponding to destination storage bin. Why ? Because, we have 2 resource such a forklift and manup which work restricted.

Forklift transfer HU gr-area to in front of destination bin. IN-X locations defined for this purpose.

Manup work inside of high rack corridors that transfer HU from IN-X location to destination bin.

I think that we have to create 2 warehouse tasks. First task to transfer HU gr-area to IN-X location and second task transfer HU from IN-X to destionation bin. However, system must be find related IN-X location.

For example for putaway :

1 - WT1 --> Hu transfer from gr-area to IN-3 .

2- WT2 --> Hu transfer from IN-3 to A3-04 .

Not : IN-3 determined so that final destination bin A3 !

I will try to solve this scenerio with POSC .

What is your idea ?

Accepted Solutions (1)

Accepted Solutions (1)

former_member183155
Active Contributor
0 Kudos

Hi all ,

I tried layout oriented storage control. 2 WT are created.

i have to solve dynamic ID-POX location. If i solve it with standard ways, i will update you. Destination storage group might be integration point.

BR

M.Ozgur Unal

former_member183155
Active Contributor

Dynamic IN-X bin determined.

Best Regards.

M.Ozgur Unal

Private_Member_324719
Participant

Hi Mehmet,

Thank you, i was struggling with the same topic, and the destination storage group approach solves my question.

Good work,

João

former_member183155
Active Contributor
0 Kudos

Good luck .

Answers (3)

Answers (3)

schulte-bahrenberg
Contributor

...try with layout oriented storage control. That should work better for this scenario.
We have a video online about this topic which should help you to identify whether this functionality can be of a help in your scenario or not:

https://www.youtube.com/watch?v=_6a1Sy-tYOA

Here are some more details from SAP help:

https://help.sap.com/saphelp_scm50/helpdata/en/a5/b32d412ac9f323e10000000a155106/frameset.htm

former_member183155
Active Contributor
0 Kudos

Hi ,

Bruce Huang , Serhan Er , Juergen Pitz .

What do you recommend for this process ? I will try layout oriented process control but i am not sure about dynamic IN storage bin determination.

BR

M.Ozgur Unal

former_member183155
Active Contributor
0 Kudos

Hi Hendrik Schulte-Bahrenberg,

Do you think LOSC provide a solution for dynamic IN-X location determination ? As you know , firstly we have to transfer HU to IN-X intermediate storage type and storage bin.

However , can i assign WT to different resources ?

M.Ozgur Unal