on 05-07-2018 9:27 AM
Hi all ,
I have a interesting question that might be solved process oriented storage control or layout oriented storage control but i want to get your thoughts.
Firstly, you can look at enclosed screenshot.
To Sum up , steps are given :
HU is created in semi-product production line then transfered to ewm storage location.
HU wait in GR Area then SAP might recommend destination storage bin. But , our scenerio, Hu must be transfer to IN-X location. X must be dynamic corresponding to destination storage bin. Why ? Because, we have 2 resource such a forklift and manup which work restricted.
Forklift transfer HU gr-area to in front of destination bin. IN-X locations defined for this purpose.
Manup work inside of high rack corridors that transfer HU from IN-X location to destination bin.
I think that we have to create 2 warehouse tasks. First task to transfer HU gr-area to IN-X location and second task transfer HU from IN-X to destionation bin. However, system must be find related IN-X location.
For example for putaway :
1 - WT1 --> Hu transfer from gr-area to IN-3 .
2- WT2 --> Hu transfer from IN-3 to A3-04 .
Not : IN-3 determined so that final destination bin A3 !
I will try to solve this scenerio with POSC .
What is your idea ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mehmet,
Thank you, i was struggling with the same topic, and the destination storage group approach solves my question.
Good work,
João
...try with layout oriented storage control. That should work better for this scenario.
We have a video online about this topic which should help you to identify whether this functionality can be of a help in your scenario or not:
https://www.youtube.com/watch?v=_6a1Sy-tYOA
Here are some more details from SAP help:
https://help.sap.com/saphelp_scm50/helpdata/en/a5/b32d412ac9f323e10000000a155106/frameset.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Bruce Huang , Serhan Er , Juergen Pitz .
What do you recommend for this process ? I will try layout oriented process control but i am not sure about dynamic IN storage bin determination.
BR
M.Ozgur Unal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Hendrik Schulte-Bahrenberg,
Do you think LOSC provide a solution for dynamic IN-X location determination ? As you know , firstly we have to transfer HU to IN-X intermediate storage type and storage bin.
However , can i assign WT to different resources ?
M.Ozgur Unal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.