Weekly lot size

Hi,

Want to plan material based on weekly lot size. However, am working in a region where week begins on saturday and ends on thursday with friday off.

Have tried maintaining a planning calendar for the same and used lot size PK.Also, have maintained the factory calendar accordingly but, the system does not give desired result.

Am I missing something?

Tarang

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 08, 2008 at 05:46 AM

    1. In Factory calener in spro, use No. first workday as 5 (i.e Saturday)

    2. Have you updated the new factory calender in the Plant.

    3. In Planning calender , Period begin on following weekday = 6- Saturday

    4. have you updated Planning calender correctly in material master

    pleae check

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.