BOM Phantom Item

869 Views

Hello All,

I'm looking for the solution or the guidance from you.

I've a BOM for the FG material which will have a Raw material,SFG and Returnable Packaging Material.When We process this BOM to make the Production all the materials which are in this BOM gets consumed,all the materials stocks are getting reduced.

Then We ship the FG gods to the customer along with the RTP material.Now for the RTP material stocks are getting reduced by two time,one is at the BOM level and one is at the Sales/ship to the customer.As we dont want stocks to be reduced by two times.We want to acheive theat stocks should get reduced by only one time.

Is there any setting in the BOM or Material Master(MRP Views) level so that i can control the stocks being reduced by two times.

Thanks,

John B