Inspection lot in CRTD?

Dear All,

I have linked MIC with class charact and used it in eq task list and scheduled plan and checked my insp lot is in CRTD, I cant record Result. how to bring it into REL status?

my observation is i have not assigned the sampl pro to the task list as MIC is with ref to class charct.

kindly suggest whats missing?

Regards,

Anil

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Nov 07, 2008 at 12:11 PM

    hi

    While assigning the MIC in the task list you can specify the sampling procedure .also check whether the task list you have created is seen in the inspection/task list in the inspection plan

    Also go in to the inspection lot in change mode ,click the sample tab and press the sample button (after assigning the sampling procedure in the task list).then save inspection lot will be released

    regards

    thyagarajan

    Add comment
    10|10000 characters needed characters exceeded

  • Nov 07, 2008 at 02:49 PM

    Hi Anil,

    Since the samplingprocedure has not linked with MIC the system could not determine the sample size.First link the sampling procedure in inspection plan and the edit inspection lot and reassign it.Also check with the task list usage and release stats.If u need the sampling plan mandatory eanble the control indicator for the coreesponding MIC.

    regards,

    Lenin. A

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Dear Thyagarajan,

      My problem is solved.

      Actually I selected wrong class type in class characteristics thats why system was not allowing Sampling procedure with MIC.

      now I have selected correct class 037 and my measurement documents for meas. points updated after Results recording.

      Thanks.

      Regards,

      Anil