cancel
Showing results for 
Search instead for 
Did you mean: 

Release through a confirmation

Former Member
0 Kudos

Hi experts,

When using routings and confirmations around the production floor, is it possible to have a final confirmation that will do a release when the item is done being built? My understanding is that the release would be after the quality inspection in the QM module and not as a confirmation. Which way is correct.

Thank you

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi experts,

When using routings and confirmations around the production floor, is it possible to have a final confirmation that will do a release when the item is done being built? My understanding is that the release would be after the quality inspection in the QM module and not as a confirmation. Which way is correct?

Thank you