The crystal report has been designed on Bex Query with DATE as mandatory input parameter with default values “Start Date: First day of current month” , “End Date : Current Date -1” displayed. When the report is refreshed it pops up the prompt with default values for dates as shown below in Crystal report designer.
When the report is scheduled in CMC/BI Launch Pad, the default prompt values are not shown.
Or is there any work around solution to set default values in the date by creating a parameter in CR enterprise and schedule it in CMC with default values?
Product: Crystal Report for Enterprise 4.1 SPS 02, SAP BOBJ 4.1 SPS 02.