Investment Project

Former Member
0 Kudos

Hi All.

Need some suggestion if it is possible to avoid copying of Investment profiles in lower WBS while creating project structure.

Need investment profile for AUC only in the Top WBS. Means need only one AUC for the whole project.

Thank You

Best Regards

Maneesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Or else better not to maintain it in project profile. Maintain manually in top WBS.

Regards

Former Member
0 Kudos

thanks.

Answers (1)

Answers (1)

virendra_pal
Active Contributor
0 Kudos

use substitution

when WBS level = 1

then IM profile = xxxxx

Former Member
0 Kudos

thanks