I want to to know the config check list for pp before i transport it to Q-server for unit testing,and also what are the no ranges I have to maintain as a PP consultant

Please help.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

HI,

Pls. find the list of PP configuration as below:

List of PP Transport Request and their IMG Path

1) Define Distribution Keys

IMG > Production Planning for Process Industries > Master Data > Material List > Item Data > Item Data from related areas > Define Distribution Keys

2) Determine Person responsible for Resource u2013

IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine Person responsible

3Define Planner Group-

IMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner

4) Define Capacity Planner u2013

IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning > Determine Capacity Planner

5) Determine Standard Value Parameter u2013

IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value > Define Parameter

6) Define Setup Groups and Setup Group Categories

Define set up groups and set up categories u2013

IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and phases > Define set up groups and set up group categories

7) Define copy setting between plants-Process

IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting between plants

😎 Define Set Up Control Recipe destination u2013

IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up control recipe destination

9Define MRP controller u2013

IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller

10) Special Procurement u2013

IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement types

11) Define Floats (Scheduled Margin Key)-

IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin Key)

12Define Splitting of Forecast requirements for MRP-

IMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splittng of forecast requirements of MRP

13) Maintain Correction Factors for Forecast

IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction factors for forecast

14 Carry Out Overall Maintenance of Plant Parameters

Maintaining plant parameters in MRP u2013

IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall maintenance of plant parameters

15) Define Planning Horizon

Define Planning Horizon u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning Horizon

16) Activate Requirement Planning u2013

IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning

17) Define Range of Coverage Profiles (Dynamic Safety Stock)

Range of coverage profile u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of coverage profile (Dynamic Safety Stock)

18) Define Stock in Transfer and Blocked Stock Availability

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Stock in transfer and blocked stock

19) Define MRP Areas

IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas

20) Carry out maintenance of MRP groups

IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP groups

21) Define Scope of total Planning - MRP

IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning

22 Define Order Types

Define Order Type-

IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type

23Define Order Type Dependent parameters u2013

IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type Dependent parameters

24) Define Production Scheduler u2013

IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of Material > Define Production Scheduler

25 Define Checking Control - Process Order

Define Availability Check u2013 Define Checking Control u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking Control

26) Define Checking Rule for backorder processing u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking rule for back order processing

27Define Stock and batch determination for good movement u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Define Stock and batch determination for good movement

28) Specify Scheduling Parameters

Specify Scheduling Parameters u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Specify Scheduling Parameters

29) Define Reduction Strategies

Define Reduction Strategy u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Resource data > Define Reduction Strategy

30) Define Confirmation Parameters

Define Order Confirmation u2013

IMG > Production Planning for Process Industries > Process Order > Operations >

Confirmation > Define Confirmation Parameters

31) Define Valuation of Goods Received

Define valuation of goods receive u2013

IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods received

32) MRP creation indicator u2013

IMG > Material Management > Consumption based Planning > Planning > Define creation indicator

33) Define safety stock u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Safety Stocks

34) Define alternative determination of Production u2013

IMG > Production Planning for Process Industries > Process Order > Operations > BOM selection > Define alternate determination of production

35) Define no. ranges u2013

IMG > Production Planning for Process Industries > Process Order > Master data > Order > Number Ranges > Define number ranges for orders

Further you need to do Manual Configuration in PP after Transport Request transfer in Production Server:

1) Define Distribution Keys

2) Determine Person responsible for Resource

3Define Planner Group-

4) Define Capacity Planner

5) Determine Standard Value Parameter u2013

6) Define Setup Groups and Setup Group Categories

7) Define copy setting between plants-Process

😎 Define Set Up Control Recipe destination

9Define MRP controller u2013

10) Special Procurement

11) Define Floats (Scheduled Margin Key)

12Define Splitting of Forecast requirements for MRP

13) Maintain Correction Factors for Forecast

14 Carry Out Overall Maintenance of Plant Parameters

15) Define Planning Horizon

16) Activate Requirement Planning

17) Define Range of Coverage Profiles (Dynamic Safety Stock)

18) Define Stock in Transfer and Blocked Stock Availability

19) Define MRP Areas

20) Carry out maintenance of MRP groups

21) Define Scope of total Planning - MRP

22 Define Order Types

23Define Order Type Dependent parameters

24) Define Production Scheduler

25 Define Checking Control - Process Order

26) Define Checking Rule for backorder processing

27Define Stock and batch determination for good movement

28) Specify Scheduling Parameters

29) Define Reduction Strategies

30) Define Confirmation Parameters

31) Define Valuation of Goods Received

32) MRP creation indicator

33) Define safety stock

34) Define alternative determination of Production

35) Define no. ranges

Following Number ranges you need to define :

In OPPQ you need to define Number Ranges for :

Planned Orders

Reservations / Dependent Requirements

Purchase Requisitions

MRP Lists

Simulative Dependent Requirements

Similarly you need to define Number Range for :

Production Order in CO82

Confirmations in CO80

Reservations in CO83

Operations in CO81

Capacity Requirements in CO84

Same way you need to maintain all other number ranges in Production Server manually. However first you need to transfer Number range object through Transport Request.

Hope this helps.

Award points if useful.

Regards,

Tejas

Former Member
0 Kudos

Thanks a lot your ans is realy helpful .I have a small doubt: Img>material managment>cbp>number range>define no range for -planning run.pl tell me I have to maintain this one?

Former Member
0 Kudos

HI,

The number range you have mentioned here is covered in OPPQ number ranges as I mentioned in my previous reply.So I dont think it is required to be maintained here because in OPPQ all MRP related parameters for Plant you are maintaining.

Hope this clears your doubt.