Skip to Content
0

What ar the basic criteria to fill-out inside TCode PK07 to obtain a Kanban Proposal?

Apr 30 at 04:45 PM

17

avatar image
Former Member

1. Do parts first have to be set-up in MM a particular way so that the data pull inside PK07 identifies only parts in the kanban family? If yes, what are those pertinent fields and what should those inputs be. Is this also where we would identify if a specific material inside a specific storage location will be planning relevant (and is this the same thing as being 'MRP Relevant?')

2. Once MM is set-up correctly, per above, I imagine the next step is to set-up the kanban schematic, using PK07, correct? What are the basic fields to fill out? There are is a lot of information, but I need to know: 1) which are the most common fields, 2) what should those inputs look like, 3) if possible, a list of definitions explaining what each field is/does.

3. Once a report is output, what are the next steps to execute kanban creation/maintenances using the proposed data?

4) For large number of changes, what's the best approach, to avoid single-item entries?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers