Special Procurement Key- Withdrawl from alternate plant (40)

Hi PP Gurus,

Special Procurement key 40 (standard) I'm using for material to be transferred from alternate plant against STO. The requirement is same material can be withdrawn from two alternate plants. I mean to say material A is getting produced in two plants say Plant 2000, 3000 and getting consumed in Plant 1000. If withdrawal from one plant say Plant 2000 OR 3000 then it can be configured using standard Spcl Proct Key 40. But here withdrawal from two alternate plants.

How it can be managed? Please come with suggestion.

Thanks & Regards,

Abu Arbab

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 30, 2008 at 04:03 PM

    Please note that it can be done using Quota arrangement using MEQ1.

    In Quota arrangement you need to specify plant 2000 and 3000 with the % of qty.

    pl come back if required

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.