Hi All,

When I try to change the revision level for a certain change number in our production client in the material master I get the following error

Priority of revision level E is too small

I have checked in CC13. But I could not find anything relevant.

There are a number of revision levels available in the dropdown list.If I select some of the last revision levels available in this dropdown list in the material master the system accepts it readily but if I select any of the earlier revision levels in the list the system throws the above error message.

Please can someone tell me what is wrong here.

Regards,

V S

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Nov 03, 2008 at 05:05 AM

    Hello All.......any clues???

    Does this belong to MM?......if not where can I get answers?.....which forum can I refer?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 03, 2008 at 10:35 AM

    issue resolved

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.