Skip to Content
avatar image
Former Member

PROCEDURE FOR USING CONTROL CHARTS IN SPC

Hi GURUS,

Can anybody let me know what are the basic settings required to be done for using control charts.

Regards

Ram

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    Oct 27, 2008 at 04:12 AM
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 26, 2008 at 01:16 AM

    Hi Ram

    First thing you need to maintain

    1. Master Inspection Chars with SPC Check Box checked in Control Indicator

    2. Sampling procedure with SPC Chart

    3. In Inpection Plan / Receipe, you need to select the SPC Criteria.

    Once you are done with all these basic Data maintainence, Record Results & press Results History Button at Results Recording Screen. Then you ll get Control Charts / Histogram.

    Hope this ll help.

    Regards

    APS

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Aman,

      Thanks for your reply,i have created the required settings

      and was able to fullfil my requirements

      Regards

      Ram

      Edited by: RAMKUMAR WARIYAR on Oct 27, 2008 8:19 AM

  • avatar image
    Former Member
    Jun 10, 2009 at 03:29 PM

    Issue not closed

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 11, 2009 at 04:30 AM

    dear Ram

    please let me know if you have not yet able to create the control chart. I may be able to help you out

    Regards

    gajesh

    Add comment
    10|10000 characters needed characters exceeded