PROCEDURE FOR USING CONTROL CHARTS IN SPC

Former Member
0 Kudos

Hi GURUS,

Can anybody let me know what are the basic settings required to be done for using control charts.

Regards

Ram

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Answers (3)

Answers (3)

former_member186399
Active Contributor
0 Kudos

dear Ram

please let me know if you have not yet able to create the control chart. I may be able to help you out

Regards

gajesh

Former Member
0 Kudos

Issue not closed

Former Member
0 Kudos

Hi Ram

First thing you need to maintain

1. Master Inspection Chars with SPC Check Box checked in Control Indicator

2. Sampling procedure with SPC Chart

3. In Inpection Plan / Receipe, you need to select the SPC Criteria.

Once you are done with all these basic Data maintainence, Record Results & press Results History Button at Results Recording Screen. Then you ll get Control Charts / Histogram.

Hope this ll help.

Regards

APS

Former Member
0 Kudos

Hi Aman,

Thanks for your reply,i have created the required settings

and was able to fullfil my requirements

Regards

Ram

Edited by: RAMKUMAR WARIYAR on Oct 27, 2008 8:19 AM