Dear all

My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis is showing 25 quantity planned cost but in actual cost showing only one quantity .why?

Means EX . material cost is 1 rs in material master .

planned cost is 25

actual cost is showing 1 rs for first issue material cost

why system is not showing rs 25 actual cost in cost analysis in production order?