Skip to Content
author's profile photo Former Member
Former Member

Cost Center & Cost center Hierarchy

Hi Friends,

Can you please tell me how to block a cost center or cost center groups for posting.

Also let me know can it be possible to move cost center hierarchy from DEV client to Unit testing client. As while defining cost center structure in DEV client, there is no Transport Request generated.

regards,

Priya

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Oct 21, 2008 at 10:12 AM

    Hi,

    You can transfer your hierarchy in several ways. If you want to create a change request and include it in a transport, then use OKE5 transaction.

    Regards,

    Eli

    P.S. The answer regarding the blocking, you have already got from my fellow SAP expert.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 21, 2008 at 08:45 AM

    Hi,

    To block Cost center --go to KS02 and Under control data block the posting. Or change the validity period to stop using Cost center.

    There is no block function for Cost center hierarchy.

    In general, master datas are being created in the system. It is not required to be transported.

    Hope, it helps!

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.