cancel
Showing results for 
Search instead for 
Did you mean: 

WM-SD relation

Former Member
0 Kudos

We are implementing WM and have a problem in the relation with SD.

We have a customer order, with its corresponding delivery, with two positions of the same material: one position with price and one gift position (according to the SAP standard), that adding them they complete a single pallet.

The wished behavior is that SAP, during generation of the transport order, accumulates both positions, looking for a complete pallet stored in our store.

Nevertheless, SAP treats the positions of the delivery separately and generates two positions in the transport order, looking for the materials separately.

Can someone contribute something to this topic?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

We have tried with picking in 2 steps, but the user process is too hard to implement it.