Skip to Content
0

Need help in PI - Upgrade from 7.3 Ehp1 to 7.5 Sp10

Apr 26 at 08:33 AM

61

avatar image
Former Member

Hi

We have upgarde our PI dual stock environment from 7.3 EHP to 7.5 Sp10, Below is the steps we followed in UPgrade

1.PI UPgarde from 7.3 to 7.5 using SUM

2. Dual Stock Split using SWPM

3. Running PI EHP upgrade wizard (we facing the Issue while executing configuration wizard and it is generating RFC_TMP_1 With java instance number for ABAP connection which is giving error )

is the above sequence correct ? Or do we have to run the PI ehp upgrade configuraiton wizard before dual Stock Split

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Mark Smyth
Apr 27 at 09:32 AM
0

Hello Babu,

Are you following an official upgrade guide for this procedure? See note 2574603 PI: Official SAP Guide Finder. For example, the SAP NetWeaver Upgrade Master Guide. See section 4.1.3.1 Upgrade Sequence.

I don't think it is necessary/required to run the EHP Wizard in this situation. You are moving from EHP to 7.50.

After the split has completed, you do need to run the wizard in note 2190371 Configuration Wizard: PI Split.

Regards
Mark

Share