cancel
Showing results for 
Search instead for 
Did you mean: 

Sub contracting

Former Member
0 Kudos

hi,

while doing Subcontracting i got the following message

"not possible to determine any components"

why and how to solve

thnks

ganesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

1. In Material master MRP4 view - Field "Individual/Coll" should have value "2" or "Blank" & In BOM (Transaction code CS03) item detail section - Field "Explosion Type" should have value "LB" ("Individual/Coll" should have value "2" or "Blank") .

2. PIR should have PIR Info category "3" , i.e., Subcontracting PIR must available for header material which we receive back from subcontractor.

3. Special Procurement Key must be "30" in material master MRP2 View.

4. Purchasing Item Category must be "L" and production BOM must be maintained, if you want to explode BOM in PO.

5. Please check BOM valid period is effective from in Tcode cs03

6. Please check your PO date against the valid date of the BOM valid period.

Answers (6)

Answers (6)

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Create a BOM for the finished good in transaction CS01.

Former Member
0 Kudos

In PO line item details in Material Tab mantain components for the same press on the components and go insde and mantain the componenets.

If BOM exists for the same Press explode BOM

Regards

Shakir

former_member192897
Active Contributor
0 Kudos

Hope you have already Maintained BOM Properly for End Product.

Now Please Ensure the Following :

Purchasing Item Category must be "L" and production BOM must be maintained, if you want to explode BOM in PO.

Please check BOM valid period is effective from in Tcode CS03

Please check your PO date against the valid date of the BOM valid period.

You can find out lot of similar threads in sdn mm forum.

Please read the rules use the search...

Edited by: Áshøk Kümàr Telikülà on Oct 20, 2008 9:50 AM

former_member581212
Active Contributor
0 Kudos

check whether you have Maintained BOM Properly for End Product...

Also check,Purchasing Item Category must be "L" and production BOM must be maintained, if you want to explode BOM in PO.

Please check BOM valid period is effective from in Tcode CS03

Please check your PO date against the valid date of the BOM valid period.

Regards,

Priyanka.P

Former Member
0 Kudos

HI

In PO line item details in Material Tab mantaine components for the same press on the components and go insde and mantain the componenets.

If BOM exists for the same Press explode BOM

Regards

Sujoy