Skip to Content
0
Former Member
Oct 19, 2008 at 04:17 AM

How many SLD's require for 2 solman system requirements?

13 Views

Scenario1:

One solman system for entire landscape->One SLD is required.

Is this SLD should be a seperate system or can be within solman?

Scenario2:

One solman system for DEV/QAS and other solman system for PRD.

How many SLDs are required? Can we manage with single SLD?

If two SLDs, Then both should be seperate systems. i.e, One SLD -> DEV/QAS Solman, Another SLD ->PRD Solman.

If only one SLD, Then it should be seperate system or can be within solman?

We do have EP in client enviroinment. Can we use SLD of EP?