cancel
Showing results for 
Search instead for 
Did you mean: 

posting period in MM

Former Member
0 Kudos

while the system was showing the problem of posting period problem(posting period was defined between sep 2008 to oct 2008 but system was not accepting the posting period. it is sollved after defining that period in ob52.

when posting(migo) is done ,it should have been done without any error.but the system is showing the error as:for object

RF_BELEG 1000,number range interval 50 does not exist FBN1.how to solve the issue.

Accepted Solutions (1)

Accepted Solutions (1)

kunal_ingale
Active Contributor
0 Kudos

hi

got ot FBN1

here select ur co code

then click on intervals button

then click on insert

here insert the interval as follows

50 2008 5000000 5099999

hope it helps

regards

kunal

Answers (1)

Answers (1)

Former Member
0 Kudos

Then, Go to FBN1 Transaction,

enter your Company Code (1000)... Press Edit Interval Button.

and Maintain Number Range Object 50 for 2008 Year.