Skip to Content
avatar image
Former Member

transfer posting of material from one Sloc to other Sloc using STO

Hi,

I need the entire config details for material transfer posting from one storage location to another storage location using STO .All the proceeses I require in details.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • avatar image
    Former Member
    Oct 17, 2008 at 12:23 PM

    Hai,

    For str loc to str loc transfer u need not to do any settings and also need not to create the STO. use the following mvt types.

    One step:

    311-unrestricted to unrestricted

    321-QI to unres

    349-Blocked to QI

    323-QI to QI

    325-Blocked to blocked

    Two step:

    313-unres to unres (stock removal)

    315-stck placement.

    Regards,

    BSK

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 17, 2008 at 12:33 PM

    Go transaction MB1B and use 311 movement

    why u need STO between S.locations

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 17, 2008 at 12:44 PM

    it is not possible to send material using STO for storage loc

    u can use movement type 311 for the transfer posting of material from one store to another

    or u can use 313 and 315 for two step transfer

    regards

    kunal

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 22, 2009 at 03:37 AM

    ANSWERED

    Add comment
    10|10000 characters needed characters exceeded