MDG-M Change Number Future Date Error

0 Kudos

Hi all,

I would like to test the material revision capabilities of MDG-M. For that I have created a Change Master with a Change Number and a Valid From date in the future in ERP (tx.: CC02). I am using the MAT02 change request and after I have chosen a material I assigned the change number to the Change Management section in the MDG-M UI:

When I try to activate the CR then my expectation would be that MDG-M writes this material with the change(s) into the objects list of this change master. Instead I am receiving following validation log entry:

P.S : this was taken with reference of already asked question and was not answered.

Accepted Solutions (0)

Answers (1)

Answers (1)

loga201
Contributor
0 Kudos

Hi Mamta,

MDG change management supports current and past validity date. For future try with MM12.

Thanks and Regards,

Logan.D

0 Kudos

Hi Logan,

Thanks for the Response,

But I would like to update the future date via MDG-M instead of CC02.

Thanks.