on 10-15-2008 6:16 PM
When we run a collective MPS (MD40 in batch) for some materials the md46 evaluation shows an abnormal ending of the planningrun with error-message ´The date 4,225 is not convertible (please correct) ´ (message id 61, mes.type E, message 060.)
This message does not show up during online single MPS-planning.
There is no documentation
What is the incorrect date the MD40 tries to convert, where can i find it.
Dear,
The total replenishment lead time in the MRP view in the material master is more than factory calender. Change TPL to small number or extend the factory calender.
Or refer the notes note 457994
Regards,
R.Brahmankar