Skip to Content
author's profile photo Former Member
Former Member

Batch determination

Hi gurus,

Can you please tell me what are the different steps in configuration of batch determination function. At what point of time we should perform this? Can we do it at planned order level? Please reply

Regards

Rajib Pathak

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Oct 15, 2008 at 08:06 AM

    Hi Rajib,

    Refer below Link for Help on Batch Determination,

    [Batch Determination Configuration|http://www.sap-img.com/materials/config-setting-in-batch-management.htm]

    [Batch Determination Help|http://help.sap.com/bestpractices/BBLibrary/Documentation/G91_BB_ConfigGuide_EN_DE.doc]

    [BB Configue Guide for Batch Determination|http://help.sap.com/bp_bblibrary/600/documentation/H20_BB_ConfigGuide_EN_DE.doc]

    You can perform Batch Determination at the time of,

    - Goods Issue or Transfer (Inventory Level)

    - In Process \ Production Order

    - Batch Determination in Sales and Distribution.

    But you can not do Batch Determination in Plan Order.

    Regards,

    Dhaval

    Edited by: Dhaval Choksi on Oct 15, 2008 1:46 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Rajib,

      If You want to do Batch Determination in Production Order than create Batch Determination Strategy by using T.code COB1.You can put Batch Split up to 999 Nos. Means System will split the required qty up to 999 Batches in case of Qty is not fulfilled by single Batch.

      After Batch Determination In Order itself System will auto update the Order reservation also.You will selected Batch No. in Reservation also.

      One more thing If you want to do Auto Batch Determination for components then tick Option 3 For Batch Entry in MRP 2 view of Material Master.

      Regards,

      Dhaval

  • author's profile photo Former Member
    Former Member
    Posted on Dec 19, 2008 at 05:53 PM

    OK

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.