Configaration Steps of WIP Calculation of WBS Element By period

Hi Friends...

Plz help me for What are the configuration steps for WIP Calculation of Projects (WBS Elements), with help of that configuration system enable me for actual cost & revenue must bet transfer to FI

Thanks

PRBR

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Oct 14, 2008 at 09:14 AM

    To Calculate WIP, U need to run Result analysis. For that u need to maintain Result Analysis Key in the project. Refer below steps for RA Config.

    Configuration steps for RA.

    Result Analysis.

    1. Maintain RA Key (Tcode: OKG1)

    2. Maintain RA Version (Tcode: OKG2)

    3. Define Valuation method for RA (Tcode : OKG3)

    4. Define Line ID's

    5. Define Assignment of RA (Tcode :OKG5)

    6. Define Update for RA (Tcode: OKG4)

    7 Define Posting rules for settlement to accounting (Tcode: OKG8)

    8. Maintain the RA Key in Tcode: OPSA Controlling tab, if the Default RA key is to be maintained while creation of the project.

    Also refer below link...http://help.sap.com/saphelp_47x200/helpdata/en/90/ba7014446711d189420000e829fbbd/frameset.htm

    Venkat

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Venkat Garu...

      Thanking you for reply. I completed all that settings but system not posting that entries to FI ( what is the settlement rule of main WBS Element) in place of that system posted to CO-PA

      Please reply soon

      Thanks

      PRBR