Hi PP Gurus,
I'm facing error while doing MFBF for FG. Message no is RM175 and the detailed description for this message is
Diagnosis
This error appears under the following circumstances:
The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
Procedure
The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
Use product costing to create the standard cost estimate.
Before taking standard cost estimate all the settings are maintained properly. The subjected material is handled through Split valuation and before doing standard cost estimate some SD transaction have been already done on the same material.
If anybody faced the same problem, please help me out to get out of it.
Thanks & Regards,
Abu Arbab