SAP APO - limit horrizzont plan

Hi all,

how is possible to limit horizzont plan in SAP APO.

In other word, I have 2 order planidfied, the first for 1 december 2008 and the second for 1 april 2009. I want to modify my heuristic so only the first order is planned and the second order is ignored!!!

P.S. I must use a custom heuristic, so I must limit this horizzont plan inside a custom heuristic.

Is possible ? How ? there's some function ?

tks a lot,

bye.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Oct 14, 2008 at 06:42 AM

    Please check BADI /SAPAPO/RRP_PLANNING

    Call transaction SE18.

    Enter the BAdi name /SAPAPO/RRP_PLANNING.

    Also BADI :

    /SAPAPO/RRP_HEUR_DO

    "This BAdI enables you to execute one or more additional functions for a

    selected PP heuristic. The BAdI is called both before and after a PP

    heuristic is executed, every time the heuristic is executed. You can use

    it to include the deletion and creation of fixed pegging relationships

    in the MRP run, for example.

    The following methods are available:

    o BEFORE

    This method enables data to be changed before the PP heuristic is

    called.

    o AFTER

    This method enables data to be changed after the PP heuristic is

    called.

    "

    Manish

    Edited by: Manish Kumar Rathi on Oct 14, 2008 2:45 AM

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Nitin Thatte

      Tks Nitin,

      unfortunately I can't use this transaction because if I use it I have other problem's version ...

      So I have to find a way to limit horizzont inside a custom heuristic .. and I dont know how to make it ..